Network refresh across 120 stores, without closing a single one.
120 stores refreshed in 8 weeks, with zero lost trading hours.

Summary
| Industry | Retail |
| Region | United Kingdom |
| Services | Project rollouts · Site surveys and audits |
| Delivered for | A managed service provider, white-label |
| Duration | 8 weeks |
What the partner needed.
A managed service provider needed to replace switches and access points across 120 stores of a UK retail chain. Every store had to keep trading, work could only happen after closing time, and the provider had no engineers outside London.
How we delivered it.
We surveyed every store first and flagged 14 with cabinet or power issues before installation began. We then ran up to six stores a night with engineers briefed on one runbook, working under the provider’s name and reporting into its ticketing system each morning.
What changed.
120
stores refreshed in 8 weeks
97%
completed on the first visit
0
lost trading hours
Often booked together.
Project rollouts
Multi-site refreshes and deployments, run to one plan across every site.
Site surveys and audits
Site readiness checks, cabinet audits and asset counts before the project starts.
Field engineering and break-fix
Qualified engineers for faults, installs and smart-hands tasks, booked by the visit or the day.
Need an engineer
on site?
Send us the scope and site – we’ll confirm your engineer and arrival window the same working day.
Field engineer or vendor? Join the Dexis network →
